Khella Construction

Home Additions & Dormers in West Islip, NY

You need more room and moving is worse than building. Khella has built in Suffolk County since 2006 and files West Islip work with Town of Islip Building Division. About twenty-five minutes east.

Suffolk South Shore ZIP 11795 Permits: Town of Islip Building Division

Adding on in West Islip

Timber-framed second-storey addition under construction on Long Island

Dormers and rear extensions on capes are the standard job here. Legalising previous unpermitted work is often part of it.

Shed and full dormers, second storeys, rear extensions and in-law suites, engineered to carry properly on the house you already have.

We survey the existing framing and foundation before drawing anything, so nobody promises you a bedroom the house cannot carry.

  • Permit filed with Town of Islip Building Division, and jurisdiction confirmed before drawings
  • Structural survey of the existing framing and foundation before design
  • Shed dormers, full dormers and full second-storey additions
  • Rear and side extensions, in-law and accessory apartments
  • Steel and LVL beam work where the span calls for it
  • Roof, siding and window matching so the addition does not announce itself
  • Phasing that keeps the house liveable and weather-tight throughout
  • Flood map and elevation certificate pulled at estimate stage for West Islip parcels
Additions & Dormers — West Islip specifics

Your existing
house is the
first constraint.

An addition is a structural question before it is a design one. What West Islip houses were originally built to carry, and what town of Islip Building Division will approve, together decide how much room you actually get.

What you are adding onto

Almost entirely post-war: capes, splits and ranches on regular suburban lots, with canal-front houses to the south.

Who reviews the addition
Town of Islip Building Division

Unincorporated Town of Islip. Canal-front and bay-front work adds flood review and sometimes DEC.

What most often forces a redesign

Many of the original capes were expanded piecemeal over decades without permits. We pull the property card early, because unpermitted work has to be resolved before new work is approved.

West Islip
questions,
answered.

Can I put a dormer or second storey on my West Islip house?

Usually, but the existing structure decides. Dormers and rear extensions on capes are the standard job here. Legalising previous unpermitted work is often part of it.

Will an addition in West Islip need a variance?

Many of the original capes were expanded piecemeal over decades without permits. We pull the property card early, because unpermitted work has to be resolved before new work is approved. We check setbacks and lot coverage against town of Islip Building Division requirements before design, so a variance is a deliberate choice rather than a surprise three months in.

What kind of house am I adding onto?

Almost entirely post-war: capes, splits and ranches on regular suburban lots, with canal-front houses to the south. That original construction determines whether the foundation and framing can carry a second floor, which is the first thing we survey.

Can we stay in the house during the work?

Usually yes. We phase so the house stays weather-tight and liveable, keep the dust contained, and sequence the roof opening around the forecast rather than the calendar.

Does an addition trigger anything else in West Islip?

It can. The canal streets south of Montauk Highway are mapped and took water in Sandy. North of the highway is generally clear. In Suffolk, adding a bedroom or bathroom can also trigger a County sanitary upgrade. Both get checked at estimate stage, not at inspection.

Additions & Dormer work in West Islip?

Tell us what you are planning. We will walk the property, price it line by line, and tell you honestly whether the budget and the scope line up.

Request an estimate (516) 667-5695