You are building new, and you want the survey-to-certificate-of-occupancy job run by one firm. Khella has built in Nassau County since 2006 and files Great Neck work with Depends on the village — nine separate jurisdictions cover the peninsula. About thirty minutes west.

Nassau North Shore ZIP 11020, 11021, 11023, 11024 Permits: Depends on the village — nine separate jurisdictions cover the peninsula

Building new in Great Neck

Shingle-style custom home built on Long Island

Substantial new construction, often on teardown lots, under whichever village governs the parcel. Their setback and height rules genuinely differ.

Ground-up single-family construction from the site survey to the certificate of occupancy, including raised, flood-compliant foundations where the map calls for them.

We take a Great Neck new build from survey to certificate of occupancy: soil and sanitary, engineering, foundation, framing, envelope, full interior fit and every utility connection along the way.

  • Permit filed with Depends on the village — nine separate jurisdictions cover the peninsula, and jurisdiction confirmed before drawings
  • Site survey, soil, sanitary and flood-elevation coordination
  • Architect and structural engineer management from concept on
  • Foundation, framing, envelope and full interior fit-out
  • Flood-compliant and coastal construction where the parcel requires it
  • Utility service coordination, including long-lead electrical
  • Certificate of occupancy, warranties and close-out documents in one package
  • Flood map and elevation certificate pulled at estimate stage for Great Neck parcels
Custom Homes — Great Neck specifics

What you can
actually build
on a Great Neck lot.

On a new build the buildable envelope is decided before the architect starts: by depends on the village — nine separate jurisdictions cover the peninsula, by the flood map, and by whatever Great Neck specifically restricts. We establish all three in week one.

Who approves a new build
Depends on the village — nine separate jurisdictions cover the peninsula

Great Neck is not one municipality. Great Neck, Great Neck Estates, Kings Point, Russell Gardens, Saddle Rock, Thomaston, Kensington and others each run their own review, alongside unincorporated Town of North Hempstead. This is the most fragmented permitting on Long Island.

What the flood map dictates

Manhasset Bay and Little Neck Bay frontage is mapped. The peninsula interior is high.

What limits the envelope

Two houses on the same street can answer to different building departments with different setback rules. We establish jurisdiction in writing before anything else happens.

Great Neck
questions,
answered.

Can you build a new house in Great Neck?

Yes, ground up. Substantial new construction, often on teardown lots, under whichever village governs the parcel. Their setback and height rules genuinely differ.

Will a Great Neck new build need a raised or flood-compliant foundation?

Manhasset Bay and Little Neck Bay frontage is mapped. The peninsula interior is high. If the parcel is mapped, the base flood elevation sets your first floor height and the entire design follows from that, not the other way round.

What limits how big I can build in Great Neck?

Two houses on the same street can answer to different building departments with different setback rules. We establish jurisdiction in writing before anything else happens. Lot coverage, setbacks and whatever depends on the village — nine separate jurisdictions cover the peninsula enforces locally usually cap the house well before the budget does. We calculate the real buildable envelope before an architect starts drawing.

Who handles drawings and approvals?

We do. We bring in the architect and structural engineer, coordinate the survey and sanitary design, file with Depends on the village — nine separate jurisdictions cover the peninsula, and carry the application through plan review and any variance it needs.

How long does a custom home take?

Typically ten to fourteen months on site once permits are in hand, plus the approval period, which in Great Neck depends heavily on depends on the village — nine separate jurisdictions cover the peninsula and the complexity of the site. We give you a real schedule, not an optimistic one.

Custom Home work in Great Neck?

Tell us what you are planning. We will walk the property, price it line by line, and tell you honestly whether the budget and the scope line up.