Custom Home Builder in Merrick, NY
You are building new, and you want the survey-to-certificate-of-occupancy job run by one firm. Khella has built in Nassau County since 2006 and files Merrick work with Town of Hempstead Building Department. About fifteen minutes south-west.
Building new in Merrick
South Merrick new construction is raised, flood-compliant work. North Merrick is conventional.
Ground-up single-family construction from the site survey to the certificate of occupancy, including raised, flood-compliant foundations where the map calls for them.
We take a Merrick new build from survey to certificate of occupancy: soil and sanitary, engineering, foundation, framing, envelope, full interior fit and every utility connection along the way.
- Permit filed with Town of Hempstead Building Department, and jurisdiction confirmed before drawings
- Site survey, soil, sanitary and flood-elevation coordination
- Architect and structural engineer management from concept on
- Foundation, framing, envelope and full interior fit-out
- Flood-compliant and coastal construction where the parcel requires it
- Utility service coordination, including long-lead electrical
- Certificate of occupancy, warranties and close-out documents in one package
- Flood map and elevation certificate pulled at estimate stage for Merrick parcels
What you can
actually build
on a Merrick lot.
On a new build the buildable envelope is decided before the architect starts: by town of Hempstead Building Department, by the flood map, and by whatever Merrick specifically restricts. We establish all three in week one.
- Who approves a new build
- Town of Hempstead Building Department
Unincorporated Town of Hempstead. Waterfront work may also involve DEC and county review.
- What the flood map dictates
South Merrick is significantly flood-exposed and was hit hard by Sandy. North Merrick is clear.
- What limits the envelope
South Merrick has one of the highest concentrations of raised houses in Nassau. Building next to an already-raised neighbour brings its own grade and drainage problems.
Merrick
questions,
answered.
Can you build a new house in Merrick?
Yes, ground up. South Merrick new construction is raised, flood-compliant work. North Merrick is conventional.
Will a Merrick new build need a raised or flood-compliant foundation?
South Merrick is significantly flood-exposed and was hit hard by Sandy. North Merrick is clear. If the parcel is mapped, the base flood elevation sets your first floor height and the entire design follows from that, not the other way round.
What limits how big I can build in Merrick?
South Merrick has one of the highest concentrations of raised houses in Nassau. Building next to an already-raised neighbour brings its own grade and drainage problems. Lot coverage, setbacks and whatever town of Hempstead Building Department enforces locally usually cap the house well before the budget does. We calculate the real buildable envelope before an architect starts drawing.
Who handles drawings and approvals?
We do. We bring in the architect and structural engineer, coordinate the survey and sanitary design, file with Town of Hempstead Building Department, and carry the application through plan review and any variance it needs.
How long does a custom home take?
Typically ten to fourteen months on site once permits are in hand, plus the approval period, which in Merrick depends heavily on town of Hempstead Building Department and the complexity of the site. We give you a real schedule, not an optimistic one.