Kitchen & Bath Remodeling in Levittown, NY
You want a gut renovation done by one crew, not a relay race of subcontractors. Khella has built in Nassau County since 2006 and files Levittown work with Town of Hempstead Building Department. Our office is here, on Solar Lane.
Kitchens and baths in Levittown
Original Levitt kitchens are tiny by modern standards. Opening to the living room is standard, and the framing cooperates.
Full gut kitchens and baths under one contract: structural work, electrical and plumbing rough-in, custom millwork, tile and finish carpentry by the same crew.
One crew does the structural work, the rough-in, the millwork, the tile and the trim. You are not coordinating five subcontractors from your kitchen table.
- Permit filed with Town of Hempstead Building Department, and jurisdiction confirmed before drawings
- Gut kitchens, primary baths and powder rooms
- Structural openings, beams and load-path work where walls come out
- Electrical, plumbing and HVAC rough-in, including panel upgrades
- Custom cabinetry and finish millwork, with lead times ordered early
- Tile, stone and hardwood installation
- Dust containment and a working kitchen plan while yours is out
- No flood-map complication on most Levittown parcels — we confirm it anyway
Opening a wall
in a Levittown
house.
Interior work is where the age of the housing stock stops being trivia and starts being budget. Plaster, old service and cast-iron waste lines are all normal here, and all cost money to do properly.
- What is behind your walls
The original Levitt houses, built between roughly 1947 and 1951 — small capes and ranches designed with an unfinished expandable second floor.
- Permits for interior work
- Town of Hempstead Building Department
Unincorporated Town of Hempstead. Hempstead is the largest township in the country by population and its permit queue reflects that, so we file early.
- Where the mechanicals should sit
Inland and clear.
Levittown
questions,
answered.
What is behind the walls in a Levittown house?
The original Levitt houses, built between roughly 1947 and 1951 — small capes and ranches designed with an unfinished expandable second floor. Original Levitt kitchens are tiny by modern standards. Opening to the living room is standard, and the framing cooperates.
Do I need a permit for a kitchen renovation in Levittown?
If you are moving plumbing, altering electrical or taking out a wall, yes — filed with Town of Hempstead Building Department. Unincorporated Town of Hempstead. Hempstead is the largest township in the country by population and its permit queue reflects that, so we file early.
How long will my kitchen be out of action?
A full gut typically runs eight to twelve weeks on site. The schedule is usually set by cabinetry lead time rather than labour, which is why we order early and set up a temporary kitchen before demolition starts.
Will the electrical service need upgrading?
Often, in older Levittown housing stock. A modern kitchen adds significant load, and where the existing panel cannot carry it we price the upgrade in the original estimate rather than raising it as a change order.
Do you do the millwork and tile too?
Yes, with our own finish carpenters. The crew that frames the opening is the crew that hangs the trim, which is why the reveals line up.