Khella Construction

Custom Home Builder in Southampton, NY

You are building new, and you want the survey-to-certificate-of-occupancy job run by one firm. Khella has built in Suffolk County since 2006 and files Southampton work with Incorporated Village of Southampton, or Town of Southampton. About an hour and thirty-five minutes east.

The East End ZIP 11968 Permits: Incorporated Village of Southampton, or Town of Southampton

Building new in Southampton

Shingle-style custom home built on Long Island

High-end new construction under real design review. Shingle-style done properly, with the detailing budget the style actually requires.

Ground-up single-family construction from the site survey to the certificate of occupancy, including raised, flood-compliant foundations where the map calls for them.

We take a Southampton new build from survey to certificate of occupancy: soil and sanitary, engineering, foundation, framing, envelope, full interior fit and every utility connection along the way.

  • Permit filed with Incorporated Village of Southampton, or Town of Southampton, and jurisdiction confirmed before drawings
  • Site survey, soil, sanitary and flood-elevation coordination
  • Architect and structural engineer management from concept on
  • Foundation, framing, envelope and full interior fit-out
  • Flood-compliant and coastal construction where the parcel requires it
  • Utility service coordination, including long-lead electrical
  • Certificate of occupancy, warranties and close-out documents in one package
  • Flood map and elevation certificate pulled at estimate stage for Southampton parcels
Custom Homes — Southampton specifics

What you can
actually build
on a Southampton lot.

On a new build the buildable envelope is decided before the architect starts: by incorporated Village of Southampton, or Town of Southampton, by the flood map, and by whatever Southampton specifically restricts. We establish all three in week one.

Who approves a new build
Incorporated Village of Southampton, or Town of Southampton

Southampton Village has its own building department and architectural review board. Outside the village line it is Town of Southampton, whose rental and certificate-of-occupancy enforcement is notably strict.

What the flood map dictates

Oceanfront and Shinnecock-facing parcels are mapped, with coastal erosion review on the dunes. The village centre is largely clear.

What limits the envelope

The village architectural review board genuinely shapes what gets built. A design that ignores the local vernacular does not simply take longer to approve — it often does not get approved.

Southampton
questions,
answered.

Can you build a new house in Southampton?

Yes, ground up. High-end new construction under real design review. Shingle-style done properly, with the detailing budget the style actually requires.

Will a Southampton new build need a raised or flood-compliant foundation?

Oceanfront and Shinnecock-facing parcels are mapped, with coastal erosion review on the dunes. The village centre is largely clear. If the parcel is mapped, the base flood elevation sets your first floor height and the entire design follows from that, not the other way round.

What limits how big I can build in Southampton?

The village architectural review board genuinely shapes what gets built. A design that ignores the local vernacular does not simply take longer to approve — it often does not get approved. Lot coverage, setbacks and whatever incorporated Village of Southampton, or Town of Southampton enforces locally usually cap the house well before the budget does. We calculate the real buildable envelope before an architect starts drawing.

Who handles drawings and approvals?

We do. We bring in the architect and structural engineer, coordinate the survey and sanitary design, file with Incorporated Village of Southampton, or Town of Southampton, and carry the application through plan review and any variance it needs.

How long does a custom home take?

Typically ten to fourteen months on site once permits are in hand, plus the approval period, which in Southampton depends heavily on incorporated Village of Southampton, or Town of Southampton and the complexity of the site. We give you a real schedule, not an optimistic one.

Custom Home work in Southampton?

Tell us what you are planning. We will walk the property, price it line by line, and tell you honestly whether the budget and the scope line up.

Request an estimate (516) 667-5695