You are building new, and you want the survey-to-certificate-of-occupancy job run by one firm. Khella has built in Suffolk County since 2006 and files Westhampton Beach work with Incorporated Village of Westhampton Beach Building Department. About an hour and twenty minutes east.

The East End ZIP 11978 Permits: Incorporated Village of Westhampton Beach Building Department

Building new in Westhampton Beach

Shingle-style custom home built on Long Island

Oceanfront and bay-front new construction on piles, engineered for wind and surge, and reviewed for coastal erosion as well as flood.

Ground-up single-family construction from the site survey to the certificate of occupancy, including raised, flood-compliant foundations where the map calls for them.

We take a Westhampton Beach new build from survey to certificate of occupancy: soil and sanitary, engineering, foundation, framing, envelope, full interior fit and every utility connection along the way.

  • Permit filed with Incorporated Village of Westhampton Beach Building Department, and jurisdiction confirmed before drawings
  • Site survey, soil, sanitary and flood-elevation coordination
  • Architect and structural engineer management from concept on
  • Foundation, framing, envelope and full interior fit-out
  • Flood-compliant and coastal construction where the parcel requires it
  • Utility service coordination, including long-lead electrical
  • Certificate of occupancy, warranties and close-out documents in one package
  • Flood map and elevation certificate pulled at estimate stage for Westhampton Beach parcels
Custom Homes — Westhampton Beach specifics

What you can
actually build
on a Westhampton Beach lot.

On a new build the buildable envelope is decided before the architect starts: by incorporated Village of Westhampton Beach Building Department, by the flood map, and by whatever Westhampton Beach specifically restricts. We establish all three in week one.

Who approves a new build
Incorporated Village of Westhampton Beach Building Department

The village runs its own department and architectural review. Westhampton and Westhampton Dunes outside the village line are Town of Southampton or their own village, which changes everything.

What the flood map dictates

Oceanfront and Dune Road property sits in V zone with coastal erosion review. The village centre is behind that but still mapped in places.

What limits the envelope

Dune Road construction is governed by coastal erosion hazard rules as well as flood elevation. What you may build there is a legal question long before it is a design one.

Westhampton Beach
questions,
answered.

Can you build a new house in Westhampton Beach?

Yes, ground up. Oceanfront and bay-front new construction on piles, engineered for wind and surge, and reviewed for coastal erosion as well as flood.

Will a Westhampton Beach new build need a raised or flood-compliant foundation?

Oceanfront and Dune Road property sits in V zone with coastal erosion review. The village centre is behind that but still mapped in places. If the parcel is mapped, the base flood elevation sets your first floor height and the entire design follows from that, not the other way round.

What limits how big I can build in Westhampton Beach?

Dune Road construction is governed by coastal erosion hazard rules as well as flood elevation. What you may build there is a legal question long before it is a design one. Lot coverage, setbacks and whatever incorporated Village of Westhampton Beach Building Department enforces locally usually cap the house well before the budget does. We calculate the real buildable envelope before an architect starts drawing.

Who handles drawings and approvals?

We do. We bring in the architect and structural engineer, coordinate the survey and sanitary design, file with Incorporated Village of Westhampton Beach Building Department, and carry the application through plan review and any variance it needs.

How long does a custom home take?

Typically ten to fourteen months on site once permits are in hand, plus the approval period, which in Westhampton Beach depends heavily on incorporated Village of Westhampton Beach Building Department and the complexity of the site. We give you a real schedule, not an optimistic one.

Custom Home work in Westhampton Beach?

Tell us what you are planning. We will walk the property, price it line by line, and tell you honestly whether the budget and the scope line up.